Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.

Davidsen Middle School

Davidsen Middle School was designed as a prototype school in the Westchase area of Tampa, Florida. This 130,000 square foot middle school complex is comprised of seven buildings, namely the Administration Building, three 2-story classroom buildings, the food service/multi-purpose building, the Media Center, and the gymnasium. Also included is an art studio, music suite and a physical education facility. Each building is supported by a steel framing system in the interior and load-bearing concrete tilt-up panels at the exterior. All of the buildings are interconnected by a covered walkway supported by masonry beams, pilasters and/or walls. The building complex features a curved steel-framed metal canopy at the bus loop. The middle school was completed in 2000 for a total construction cost of $12,100,000.